Thursday, February 5, 2009

Development Plan

Summer’s Development Plan

February 6: Research & Development Plans Due

February 11: Look over the Planets & Moons Curriculum and decide how to integrate the curriculum (if at all)

February 13: Figure out the exact curriculum to use with students (and figure out what ages to work with)

February 18: Mock up a sketch of how the site will look and out line why I will be using each of the techniques in the technology side of the curriculum. Look at Colorado standards and make sure that each of the necessary standards are reached through the curriculum.

February 20: Working Critique #1

February 25: Create main pages for website and attach necessary links

March 4: Create CSS template

March 11: Record all necessary readings in my voice for students to listen to in their studies.

March 13: Find all necessary links (ie. PHET simulations, real-life pics, etc.)

March 20: Working Critique #2

April 1: Connect all links on the site and make sure everything is working right

April 10: Working Critique #3

April 17: Prepare static images for control group. Locate and attach dynamic image links on the website for the test group.

April 22: Test curriculum on children to make sure the operation is not too difficult, fix if necessary

April 24: Project Statements Due

April 27: Installations of Projects (I don’t think my project really has a great place to be displayed in the ATLAS building. Do you?)

No comments:

Post a Comment